Laserfiche WebLink
RECEIVt~ <br />Identification <br />During Inspection: <br />imate Water Level <br />nt (% total storage) <br />(cfs) <br />Rills & Gulleys <br />inadequate Vegetation <br />Outiet Channel Erosion <br />Burrows <br />Differential Settling <br />Cracks or Slides <br />Seepage <br />purtenant Structures <br />Defective Spillways <br />Dewatering Devices Clogged <br />Faulty Gates, Etc. <br />Comments <br />Required: <br />oflnspector: Jim Stover <br />QUARTERLY POND INSPECTION REPORT <br />Lodestar Energy, Inc. <br />McClave Can on Mine C-80-004 <br />Division of Minerals & Gec~: <br />Quarter: <br />Inspection <br />Pool D D D <br />0% 50% 0% 0% <br />0 0 0 0 <br />No No No <br />No No No <br />No No No <br />No No No <br />No No No <br /> <br />No Na No <br />No No No <br />No No No <br />No No No <br /> <br />No No No <br />No No No <br />Water in sediment pond is 2.5' below primary spillway. <br />No <br />Sediment needs to be removed from in front of office sediment fence. <br />Office sump should be backfilled. r r ^ ^~• <br />Topsoil sediment fence needs to be extended to the° ~q~~~ ~~~ along <br />north edge of stopsoil pile. ;~O : °- E S~° ,F9 s <br />aV:Q `~. <br />1*• 1..~ 1^r Ns F <br />• j~ •' ~Z <br />1 F ~ror 9.~ <br />P. E. 79f30:`Date <br />a <br />