Laserfiche WebLink
BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FORM <br /> <br />Please add any special comments concerning potent r~~e <br />problems on the back of this sheet. <br />Inspector <br />Pond Gdl~t'E~ ~,/ig/P NPDE9 No. D~~Z <br />Date of Inspection ~ ~ p~ <br />EMBANI(MENT <br />1. Adequacy of the vegetative cover: Excellent odert:t Few, Poor <br />2. Erosion forming gullies: Extensive, Some, ~~~~~~~ Non <br />3. is wave action causing erosion: %~~' / <br />On the upstream embankment? Yee No •/ <br />At the principal spillway inlet? Yes__ Nom/~ <br />4. Erosion of the downstream toe of the embankment? Yee No / <br />The cause of the erosion is attributed to: <br />5. Ia seepage occurring through the dam? Yee Nc~ ~ If yes <br />could this seepage cause potential instability? Yea No <br />Explain: <br />PRINCIPAL SPILLMAY <br />1. Ia the principal spillway syatea in working order? Yea No <br />2. Is the inlet free of debris and restrictive material?Yes / N <br />3. is the discharge outlet free of restrictive material? Yes~o_ <br />4. is erosion occurring at the discharge outlet? Yea_ No~If <br />yes, <br />evaluate the severity: Extensive. Moderate Juat a~tartinq None <br />EMERGENCY SPILLWAY ' <br />1. Is the overall emergency spillrly system capable of passing <br />design storm discharge? Yea Y No <br />2. Does it appear as if the emergency'spillw~y has diacliarged water <br />&EDIMENT STORAGE CAPACITY <br />1. Has the design orage capacity of <br />Yes No If yes, <br />explain• <br />since the last inspection? Yes No <br />3. Ia erosion occu inq at any section of the emergency :rpillway? <br />Yea No~ Describe the <br />extent <br />the reservoir beer: surpassed? <br />