Laserfiche WebLink
~u~ v DERHORN ~-" <br />COAL COMPANY QUARTERLY POND INSPECTION REPORT <br />Inspector Name: la.QRy ,QPSC~I~e Date: ~_¢-9 L <br />Pond Number: ~ Date Last Inspection: 4~Z~-q C <br />Site Name: 4i- /~eo%,~~ Quarter: T~~~-~ 19y! <br />1. Design Depth Measured From Spillway Invert , <br />2. Design Maximum Sediment Level Measured From Spi]lway Invert <br />3. Sediment Level/Pond Bottom Measured From Spillway Invert . <br />4. Water Level Measured From Spillway Invert <br />5. Discharge Through Spillway Since Last Inspection . <br />6. Rills and Gullies <br />7. Vegetation Adequate <br />8. Outlet Channel Erosion . <br />9. Animal Burrows <br />10. Cracks . <br />11. Seepage <br />12. Spillway Clogged . <br />13. Valves Operational ,n~i3 <br />ADDITIONAL COMMENTS: <br />2, ~ <br />2~J <br />4~ G <br />ys.~e <br />Yes X No <br />Yes Y No <br />>< Yes No <br />Yes ~ No <br />Yes u No <br />_ Yes '~ No <br />Yes Y No <br />Yes a' No <br />_ Yes _ No <br />MAINTENANCE REQUIRED: ~N <br />W j Q~ W w j <br />3 ~ ~ QO O mo ~ h •Wi <br />sPncwar save <br />~ N ~ 0. ~ <br />A ~~~ <br />