Laserfiche WebLink
COAL. COMPANY QUARTERLY POND INSPECTION REPORT <br />Inspector Name: LARRY /?erc,(L'P Date: 2-~-~/~ <br /> <br />Pond Number: / t2 Date Last Inspection: ,~i/f y! <br />Site Name: U fL Quarter: 7~~~/ /99 G <br />1. Design Depth Measured From Spillway Invert . <br />2. Design Maximum Sediment Level Measured From Spillway Invert <br />3. Sediment Level/Pond Bottom Measured From Spillway Invert . <br />4. Water Level Measured From Spillway Invert <br />5. Discharge Through Spillway Since Last Inspection . <br />6. Rills and Gullies <br />7. Vegetatfon Adequate <br />8. Outlet Channel Erosion . <br />9. Animal Burrows <br />10. Cracks . <br />11. Seepage <br />12. Spillway Clogged . <br />13. Valves Operational <br />o. ~{ <br />0 <br />• Nitre <br /> <br />. Yes ~ No <br /> <br />Yes a' No <br />Y Yes No <br />. Yes u No <br />. Yes Y No <br />. Yes _~ No <br /> <br />. Yes ~' No <br />. Yes y No <br />. N~ Yes PJo <br />ADDITIONAL COMMENTS:~v~~ <br />MAINTENAPICE REQUIRED: ,,,,,.,., <br />Q- ~ <br />WW o~ G <br />3 ~ 4 <br />SP/LLWAY SNVt <br />~ ~ f V Q ti <br />h O ~ N ~ 4 <br />W <br />` O h v e A ~~ <br />