My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO29260
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO29260
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:48:16 PM
Creation date
11/20/2007 10:35:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Hydrology
Doc Date
7/30/2007
Doc Name
2nd Quarter 2007 Stockpond Inspections
From
Seneca Coal Company
To
DRMS
Permit Index Doc Type
Sediment Pond Inspections
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Inspection Category <br />Comments (T-1 <br />PERIODIC INSPECTION FORM <br />Stockponds or Sumps <br />INSPECTOR'S NAME: Roy Karo <br />FACILITY CONFIGURATION: Stockpond <br />SITE NAME: T-2 <br />MINE NAME: Seneca II-W <br />MINE I.D. NO.: C-82-057 <br />1 <br />2 <br />0 r:l <br />DATE: L' /~/ <br />DATE LAST-INSPECTION: <br />LOCATION: NW',SW'., Sec 22, T5N, R88W <br />LOCATION: 8 mi S of Hayden, CO <br />OWNER'S REP.: Greqq Kitchen Gen.Mgr. <br />Circle or write in appropriate response <br />Angle of slope: 3.3:1 upstream, 2.3:1 downstream <br />*Seepage (specify location, color, and approximate volume) <br />At isolated points on embankment slopes: <br />At natural hillside: <br />Over widespread areas: <br />From downstream foundation area: <br />"Boils" beneath stream or ponded water: <br />Yes INo <br />Yes No <br />Yes INo <br />3. Cracks or scarps on crest: Yes No <br />9. Cracks or scarps on slope: Yes No <br />5. Sloughing or bulging on slope: Yes No <br />6. *Major erosion problems: Yes N <br />7. Surface movements in valley bottom or on hillside: Yes N <br />8. *Erosion of toe: Yes N <br />9. <br />10 <br />11 <br />12 <br />13 <br />19 <br />*water impounded against downstream toe: <br />Existing embankment freeboard: <br />Increase Decrease in water level: <br />Cracks, bulging, or erosion on upstream face: <br />Spillway erosion: <br />*Clogging <br />Spillway channels: <br />Diversion ditches: <br />feet <br />Yes N N/A <br />Yes ~ N N/A <br />, <br />Yes f~~O N/A <br />Yes :No N/A <br />~~~ <br />*Major adverse changes in these items could cause instability and should be reported <br />to the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions noted in these items should normally be described (extent, location, <br />volume, etc.) in the space on the back of this sheet. <br />Total = 5.6:1 <br />_ Yes (p7/o <br />Yes INo <br />Yes <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />feet <br />Comments: ., SF J i*"~r ~~ ~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.