Laserfiche WebLink
STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER ~~E® oe Coco <br />Division of Water Resources <br />Department of Natural Resources JUL 0 3 2005 <br />1313 Sherman Stree4 Room 818 <br />Denver, Colorado 80203 Division ~f Minerals and Geology <br />Phone (303) 866-3581 <br />FAX (303) 86b-3589 <br />www.warecsrare.co.us Response to Reclamafion Permit Application Consideration <br />DATE: July 3, 2006 <br />TO: Anthony J. Waldron, Environmental Protection Specialist <br />CC: Division 1 Office, District 49 Water Commissioner <br />FROM: Sarah K. Reinsel, E.LT. <br />RE: Operator: Kit Carson County, Klassen Pit, File No. M-2006-047 <br />Section 35, Twp 6 S, Rng 42 W, 6th P.M., Kit Carson County <br />t_~ <br />r <br />w <br />ROB <br />~1676~ <br />Bill Owens <br />Governor <br />Russe(I George <br />Executive Director <br />Hal D. Simpson, P.E. <br />State Engineer <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground water must not <br />occur during or after mining operations. <br />^ The proposed operation will consume ground water by ^evaporation, ^dust control, ^reclamation, ^water <br />removed in the mined product, ^processing, ^other: <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or other type <br />of well permit, as applicable. Prior to obtaining a permit, an approved water supply plan or decreed plan for <br />augmenhation is required. <br />^ Prior to approving a well pemrit, the applicant must conduct a field inspection of the site and document the <br />locations of all wells within 600 feet mile of the pemrit area. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the pemvt area or contact this office regazding the <br />600 foot spacing notification/hearingproces. <br />^ The proposed operation may have potential impact on existing water rights neaz the project location. Please <br />provide evidence that the proposed project will not alter or impact the historic operation of existing water rights. <br />^ The applicant has indicated plans to use other water for purposes at the pemrit site. The source of water <br />for this use is to be obtained from .Applicant needs to document that this water was diverted in priority <br />under a water right decreed for such industrial use. Applicant should contact the water commissioner for further <br />information. <br />^ The applicant has not identified any proposed use of water at the permit site. If water will be used for any <br />purpose at this site, the applicant will need to document that the water was obtained from a legal source, the water <br />was diverted in priority under a water tight decreed for such industrial use or the use of water was approved by <br />the Colorado Ground Water Commission for such industrial use. <br />