Laserfiche WebLink
Paperwork Reduction Act Notice <br />Public reporting burden for this collection of information is estimated to vary from a range of ]0 hours as as <br />average per response for some minor facilities, to 110 hours as an average per response for some major facilities, <br />with a weighted average for major and minor facilities of 18 hours per response, including time for revie•,ving <br />instructions, searching existing data sources, gathering and maintaining the data needed, and completing and <br />reviewing the collection of information. Send comments regardine [he burden estimate or any other aspect of <br />this collection of information, including suggestions for reducing this burden, to Chief, Information Policy <br />Branch, PM-223, U.S. Environmental Protection Agency, 401 M Street, SW Washington, DC 20460; and' to the <br />Office of [nformatiom and Regulatory Affairs. Office of Management and Budget, Washington, DC 20503. <br />t-- - -- <br />General Instructions <br />1. If form bas been partially completed by preprinting, disregard instructions directed at entry of [bat information <br />already preprinted. <br />2. Enter "Permillee Name%I'fai(ing Address ;and facility name/Iocatien, if diIli:rent)," "Perini! Number," and <br />"Discharge Number" where indicated. (A separate form is required for each discharge.) <br />3. Enter dates beginning and ending 'illonirorinq Period" covered by torn where indicated. <br />4. Enter each "Poron+eler" az spccified in monitoring requirements of permit. <br />S. Enter "Sample Afeosurement" data for each parame(cr under "Quantity" and "Quality" in units specified in permit. <br />"Average" is normally arithmetic avenge (geometric average for b~,ctcria] parameters) of all sarnple measurements <br />for each parameter obtained during ".Uonitormg Perod": 'Lllasrnrun" 2nd "rllinimvm" are norrally extreme high <br />and low measurements obLlined during ".llonitorin,K Period." (Note to municipals with s;,condary Veatment <br />regwrement~ Enter 30-day average of sample mcass~ements under "Average," and enter maximum 7ilay average <br />of sample measurements obtained during mon.toring ,reriod under "".fazimvm. ") <br />6. Enter "Permit Requirement" ,tor each panmcter under "Quan[iry" and "Quality" as spccified in permit. <br />7. Undzr "A'n fs" enter number of sannle mauvrments during monitoring period that e.eceed rnaxirnum (and/or <br />minimum or 7-day average az appropriate) pcrnit rcgcirement for each p: rameter. If none, enter "0". <br />8. Enter "Frequency ojAnulysis" both az ".1'an+ale +Llcasunnen[" (actual frequency of sampling and analysis used <br />during monitoring period) and as "Perini! Requirement" spcc~ed in permit. (e.g., En[cr "Coat," ter conLnuous <br />monitoring, "l/7" for one day per week, "1/30" for one day per month, "//90" for one day per quarter, etc.) <br />9. Enter "Smnple Type" both as ':Sample alensu+•eu,ent" (actual sample type used during monitoring period) and az <br />"Permit Requirement," (e.g., Enter "Grab" 1'or indi~idua] sample, "24HC" for 24-hour composite, "iJ/A" for <br />continuous monitoring, etc.) <br />10. Where violations of permit requirements arc reported, attach a brief exp anation to describe cause and rnneclive <br />actions taken, and reference each violation by date. <br />l1. if "no discharge" occurs during monitoring period, enter "No Discharge" across form in place of data entry. <br />12. Enter ",VameiTirle ojPrincipnl Executive O~cer" wish "Signature ojPrincipal Erecurive Officer oj.4utharized <br />Agent," "Telephone Number," and "Date" al bottom of form. <br />13. Mail signed Report to O[lice(s) by date(s) specified in permit. Retain copy for your records. <br />14. More detailed instructions (or use of this Discharge Afoniroring Report (D~LfR) torn may be obtained from Office(s) <br />specified in permit. <br />Legal Notice <br />'t'his report is required by law (33 U.S.C. 1318; 40 C.F.R. 175.27). Failure to report or failure to report truthfully can <br />result in civil penahies not to exceed x10,000 per day of violation; or in criminal penalties not to exceed 525,000 per day <br />of violation, or by imprisonment for not more than one year, or by both. <br />EPA Form 3320-1 (Rev. OS-95) <br />