Laserfiche WebLink
<br /> <br />LIST OF FIGURES (cont.) <br />Figure 3.5-1 Soils Map (1" = 2000') <br />Figure 3.5-2 Soils Map (1" = 500') <br />Figure 3.6-1 Vegetation Map (1" = 2000') <br />Figure 3.6-2 Vegetation Map (1" = 500') <br />Figure 4.2-1 Coal Lease and 5-Year Permit Boundaries <br />Figure 4.2-2 Schematic of In-Mine Monitor Use <br />Figure 4.2-3 Surface Facilities Location Map <br />Figure 4.2-4 Portal #2 Access Road Profile <br />Figure 4.2-5 Mine Site Area Profile <br />Figure 4.3-1 Schematic of Typical Production Panels <br />Figure 4.3-2 Schematic of Main Entries (Intake and Retum) <br />Figure 4.3-3 Vent and Escapeway Locations <br />Figure 4.3-4 Ventilation Fan Locations <br />Figure 4.3-5 Schematic Hydraulic System Flowchart <br />Figure 4.3-6 Pond A As-Constructed Plan <br />Figure 4.3-7 In-Mine Refuse Disposal Area <br />Figure 4.3-8 Test Well & Pipe Location <br />Figure 4.3-9 Deleted 12/12/96 - TR-014 <br />Figure 4.4-1 Reclamation and Closure Plans for Portal #1 <br />Figure 4.4-2 Reclamation and Closure Plans for Portal #2 <br />Figure 4.4-3 Plan Map of Surface Facilities <br />Figure 4.4-4 Cross-Section of Surface Facilities <br />Figure 4.6-1 Lowering of Crossarm <br />Figure 4.6-2 Elevated Perch Construction <br />Figure 4.6-3 Perch Guard <br />Figure 4.6-4 Groundwater Monitoring System <br />Figure 4.7-1 Ditch System and Small Area Exemptions <br />Figure 4.7-2 Future Land Use <br />Figure 4.7-3 Road Map <br />Figure 4.7-4 Final Contours <br />Figure 4.7-5 Final Configuration -Cross Sections <br />Figure 5.1-1 Reconnaissance AVF Map <br />Figure 5.2-1 Detailed AVF Map Surface Facilities Area <br />Figure 5.2-2 Groundwater Level Projections -Cross Section D-D' <br />Figure 5.2-3 Groundwater Level Projections -Cross Section E-E' <br />Figure 5.2-4 Flood Irrigated/Subirrigated Land Surface Facilities Area <br />. CB -Coal Ridge No. 1 ix <br />~~ " z¢ 4107 <br />