Laserfiche WebLink
Inspection Categoty Comments <br />10&11 Pond is dry and Full of silt. <br /> <br />The inlet ditch needs riprap per the design o£ SIIPM-22 and the <br />outlet channel also needs some work as well. <br />Approximately 6"-12" of snow on Rround. <br />SKETCH <br /> <br />