Laserfiche WebLink
SENECA II <br />STOCKPOND INSPECTION REPORTS <br />1st QUARTER 2001 <br />Mike Altavilla <br />T-1 <br />T-2 <br />T-3 <br />T-4 <br />T-5 <br />T-7 <br />T-8 <br />T-12 <br />T-]3 <br />T-15 <br />T-16 <br />T-17 <br />T-20 <br />T-25 <br />T-26 <br />T-28 <br />T-29 <br />T-30 <br />T-31 <br />T-32 <br />T-33 <br />(MGA) -was able to drive on main haul road to check majority of stockponds. Most had no change <br />since 4~h quarter inspections (] 2/05/00). 6"-12" of snow on most areas. No repair work has been <br />done on any stockponds since the 3~~ quarter inspections (09/29/00). The stockponds not full of <br />sediment were retaining minunal amounts of water. Was unable to access any of the ponds in Karo's <br />Landing Drainage Channel due to snow conditions on the haul road. <br /> <br />