Laserfiche WebLink
<br />EXHIBIT E <br />MINING PLAN MAP <br /> <br />Topsoil will be stripped and stockpiled in the southeast corner of the pit. <br />Overburden will be separately stockpiled. Stockpile slopes will be no <br />greater than 3H:1 V. Topsoil is approximately 8"deep and overburden may <br />be 25" deep. General direction of mining will be north from the southeast <br />corner. Depth will be 10-20'. <br />