Laserfiche WebLink
~ IIIIIIIIIIIIIIIIIIIiATE C~ COLORADO <br />DIVISION OF MINERALS AND GEOLO'~~Y <br />I h•parlmeN nl Narural Resources <br />I I I { $h„rm,m 51., Nnom 21 S <br />Drnvr•r. Colorado 8020] <br />Phone: 13031 8fifi-3 i b7 <br />FAY ({1111831-N106 <br />March 12, 1998 <br />Ms. Julie M. Goe[temoeller <br />Western Mobile Southern, Inc. <br />1590 W. 12th Ave <br />Denver, CO 80204 <br />Re: Hartman Pit, M-97-087, Permit Issuance -County Construction 1Vlaterial Operation <br />Dear Ms. Goettemoeller: <br />~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Gorernur <br />lames 5 Loehhead <br />E~Mmi~e Dircuor <br />hhchaelB Long <br />Diasiun Dueau~ <br />On March 12, 1998 the Division of Minerals and Geology found Western Mobile Southern, Inc. to have <br />satisfied the applicable requirements of C.R.S. 34-32.5-101 et ems. for obtaining a mining and reclamation <br />permit. Therefore, a permit is being issued. Two signed originals of the permit have been executed. We <br />have kept one copy for out files and are enclosing one copy for your use. It is your responsibility to comply <br />with all of the terms of the permit. <br />1. All of the original application materials, as amended and supplemented, are an integral part of your <br />permit. They have been incorporated into the permit by reference. We presume that you have a copy of <br />all of these materials; therefore, none have been enclosed with this mailing. We suggest that you keep a <br />copy of the permit and the permit application at the mining operation as a reference for operating personnel, <br />to help ensure compliance with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those described in the permit may <br />require a modification to the perntit. We suggest consulting the Construction Materials Rules and <br />Regulations and/or contacting us to determine if a revision to the permit is necessary. Rule 1.10 pertains <br />to Amendments, Rule 1.9 to Technical Revisions, and Rule 1. l l to Conversions. <br />3. On your permit anniversary date each year, March 12, you must submit an annual fee and an annual <br />report [o us. The annual fee for this permit is $550.00. Please consult the Act, Rules and Regulations, and <br />your permit for specific annual report requirements applicable to your mine. <br />If you have any questions, please contact the Division. <br />Sincere <br />MICHAEL B. LON~ <br />Division Director <br />MBL/LDO/BDC <br />Enclosure <br />pl BOSS\BDCq'F.M p\hIAP'o09] LDO <br />