My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE68692
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE68692
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:14:16 PM
Creation date
11/20/2007 10:29:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002087
IBM Index Class Name
Permit File
Doc Date
9/26/2002
Doc Name
Adequcey
From
DMG
To
TMS Consulting
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatina Software <br />R(`R~PFR _ OMI Y WORK <br />Task # <br />Date <br />User <br />Agency or organ'IZation name : DMG <br />005 State :Colorado <br />09/26/2002 County :Archu/eta <br />WHE Site :Mask Ranch Gravel Pit <br />Permit or other job action : 110c <br />HOURLY EQUIPMENT COST <br />review <br />5" <br />over 4.5 acre nrocessina area <br />Model :Cat 613C Sehes 2 <br />Shift basis : 1 per day <br />Cost Breakdown : Job utilization % Horsepower : 175 <br />Ownership cosUhour : $22.04 NA Weight (UST) : 16.50 <br />Operating cosUhour : $42.82 100 Cost data source : (CRG) <br />Operator cosVhour: $24.80 NA <br />Total unit cosVhour : $89.48 ~ Total Fleet cosUhour : $89.46 <br />MATERIAL QUANTITIES <br />Initial Swell ~ Loose <br />volume: 3,830 LCY factor: NA volume: 3,630 LCY <br />Source of quantity take-off : (4.Sac)(43560sf/ac)(0.5'D)27 = 3630 cy <br />Source of estimated swell factor : NA <br /> <br />Hauling CaoaciN <br />Basis <br />2,550 pounds/LCY <br />Material description <br />Earth -Dry packed <br />Rated payload : 26,400 pounds <br />Payload capacity : 10.35 LCY <br />Cvcle Time (load + haul + spread + retuml' <br />Travel time <br />Bowl (volume) Basis <br />Struck volume : 8.90 LCY <br />Heaped volume : 11.00 LCY <br />Average volume : 9.95 LCY <br />Adjusted capacity : 9.95 LCY "' <br />Loading time: 0.90 minutes' <br />Maneuver and spreading time : 0.70 minutes <br />loatling time per pair on push-pull models <br />Route I Distance (feet) Grede (%) Roll. res.(%) Total res.(%) Velocity (fpm) I Travel time (min.) <br />~ <br />Haul : 400 0.0 10.0 10.0 582 0.89 inufes " <br />Return: 400 0.0 10.0 10.0 1,058 0.38 minutes" <br />•'tnvel time atljusted far aeeelention and deceleration at load and dump points <br />velocities are max. atlainable per total resistance shown, not avenge <br />Job Condition Correction Factors <br />Site altitude (feet) : 7,290 <br />Attitude adjustment factor : 1.00 (Gat HB) <br />Job efficiency factor : 0.83 (1 shi/t/day) <br />factor: 0.83 <br />Total cycle time : 2.67 minutes <br />dusted HourN Production <br />Unadjusted unit production : 223.98 LCY/Hour"' <br />Adjusted unit production : 185.91 LCY/Hour <br />Adjusted fleet production : 185.91 LCY/Hour <br />times volume on push-pull models <br />PermiUjob # : M-2002-087 <br />Abbreviation :none <br />Filename : M087-005 <br />JOB TIME AND COST <br />Fleet size : 1 Scraper(s) Total job time : 19.53 Hours <br />Unit cost : $0.481 /LCY Total job cost : $1,747 <br />
The URL can be used to link to this page
Your browser does not support the video tag.