Laserfiche WebLink
E <br />S codcomany Seneca Coal Company <br />April 5, 2002 <br />Mr. Michael Boulay <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RECEIVED <br />APR 10 2002 <br />Division of Minerals d Geology <br />RE: Seneca II Mine {C-80-005) Quarterly Stockpond Inspections <br />Dear Mr. Boulay: <br />Enclosed are copies of the first quarter Stockpond inspections for those structures at <br />Seneca II, which have been constructed to date. <br />Should you have any questions, please do not hesitate to call. <br />Sincerely, <br />7%r'~~ <br />Roy A. Karo <br />Safety and Reclamation Manger <br />Enclosure(s) <br />Seneca Coal Company • P.O. Box 670 • Hayden, Colorado 81639 <br />Telephone (970) 2763707 • FAX (970) 276-3014 <br />