My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO29192
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO29192
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:48:13 PM
Creation date
11/20/2007 10:27:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Hydrology
Doc Date
7/3/1996
Doc Name
REQUEST FOR STORMWATER EXEMPTION
From
KERR COAL CO
To
WQCD
Permit Index Doc Type
NPDES Permit
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Patri i Nelson <br />Date (c <br />Discharge <br />Point <br />GOBI 3 ~~ -) <br />fx~?~ .3o z. <br />Parameter(s) <br />Exceeding Limitation <br />Discharge Rate (cfs) <br />to <br />~.?~~~~ <br />i/ <br />F~ 7d 9f/ <br />'.r55 2 ~~ <br />Fe, 7.3/ <br />~s a~ s~ <br />303 <br />L`Y`3 T s `~ ,z_. <br />l <br />crs:3 <br />~ ~~ 7.;~ <br />~s .z~~_ <br />T'S $ /~ <br />E:C- 4~ j 2 / <br />coo 7 32z) Excee~ance of applicabl <br />resulted from: <br />/s C~ <br />a~ 3z~ <br />O•~'`r~ <br />/e ~~ ~ i/ <br />.~ <br />O~C.,37 <br />...ao 7. _?7__ <br />Q. 00~ ' ~ <br />e permit e_fluent limitations <br />~- Discharge from snowmelt runoff occurring within 48 hours <br />after runoff inflows to the pond(s) have stopped <br />[] Discharge from rainfall runoff occurring within 48 hours <br />after measurable precipitation has stopped <br />Documentation of precipitation and snowmelt occurrence <br />and snowmelt inflows to the ponds is retained at the minesite and <br />is available for inspection by authorized agency representatives. <br />Copies of relevant temperature/precipitation data are attached for <br />reference. <br />All sedimentation ponds are designed to contain the full <br />design runoff volume resulting from a i0 year, 24 hour storm event. <br />Stormwater storage capacity is in addition to design sediment <br />storage and any permanent storage capacity. Rerr inspects all <br />sedimentation ponds on a quarterly basis. Inspections include <br />evaluation of accumulated sediment levels relative to design <br />sediment storage capacity to verify that design stormwater storage <br />capacity is maintained at all times. if inspections indicate that <br />sediment accumulations are at or near the design sediment level, <br />Kerr removes accumulated sediment from the pond(s) within a <br />reasonable period (typically 30 to 60 days) following the <br />inspection. Both pond inspection reports and documentation of pond <br />clean-out are retained at the minesite and are available for <br />inspection by authorized agency representatives. Based on direct <br />observation of pond storage levels at the time discharge occurred, <br />the discharge resulted from: <br />Rainfall or snowmelt runoff volumes less than or equal <br />to the design 10 year, 24 hour storage volume <br />[J Aainfal'_ or snowmelt runoff volumes greater than the <br />design 10 year, 24 hour storage volume <br />
The URL can be used to link to this page
Your browser does not support the video tag.