My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO29169
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO29169
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:48:12 PM
Creation date
11/20/2007 10:26:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Hydrology
Doc Date
3/30/2001
Doc Name
1st Q 2001 Sediment Pond inspection
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;. <br />_ :, <br /> <br />,: <br />, , <br /> ,\ <br />. <br /> <br /> ~. <br />-~ <br /> <br /> <br /> <br /> <br />Pond_ <br />Date of <br />,e SE~DIM~EN~/TATION POND INSPECTION FORM <br />to,~yei7~ ~ii~iu '~ z- NPDES No. /~/~ <br />EMBANKMENT <br />I. Adequacy of the vegetative cover: Excellent, Moderate, Few, Poor <br />2. Erosion forming gullies: Extensive, Some, Very Few, None <br />3. Is wave action causing erosion <br />On the upstream embankment? Yes No ~ <br />A[ the principal spillway inlet? /l/p ~ot ~[`~~ Yes No <br />4. Erosion of the downsveam tce of the embankment? Yes No L.~ <br />The cause of the erosion is attributed to: <br />5. Is seepage occurring through the dam? Yes No <br />Could this seepage cause potential instability? Yes No <br />Explain: <br /> <br />r~ <br />PRINCIPAL SPILLWAY A/o cS~Oraw~`~ <br />1. Is the principal spillway system in working order? Yes No <br />2. Is the inlet free of debris and restrictive material? Yes No <br />3. Is the dischazge outlet free of restrictive material? Yes No <br />a. Is erosion occurring at the discharge outlet? Yes No <br />Evaluate the severity: Extensive Moderate Just Starting None <br />EMERGENCY SPILLWAY /tv ~"`[~`7 SPr~lw`~`1 <br />I. Is the overall emergency spillway system capable of passing design storm di scharge? <br /> Yes No <br />?. Does it appear as if the emergency spillway has discharged water since the last inspection? <br />' Yes No <br />3. Is erosion occtrring at any section of the emergency spillway? Yes No <br />Describe the extent: <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design storage capacjry of the reservoir been stupassed? Yes No ~ <br />~uerr.explatn: //saci~_ tHS~~ ~~zS..-, ~5 r~~.~ <br />Please add any special comments concerning potentially dangerous problems oo the back of this <br />sheet'. <br />Inspected by:~ ~~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.