Laserfiche WebLink
BASIN RESOURCES, INC. . <br />SEDIMEN/T~ATION POND INSPECTION FORM <br />Pond /1/ltt~ N~__ /~~ ~' NPDES No. ~ d ~ <br />Date of Inspection /71/~-ff ~d ~ ZDO / <br />EMBANKMENT ,~~ <br />1. Adequacy of the vegetative cover: Excellent, 'v'C~'dte, Few, Poor <br />2. Erosion forming gullies: Extensive, Some, erv ew, None <br />3. Is wave action posing erosion: <br />On the upstream embankment? Yes No `~ <br />At the principal spillway inlet? Yes No ~--- <br />4. Erosion of the downstream toe of the embankment? Yes No <br />The cause of the erosion is attributed to: <br />5. Is seepage occurring through the dam? Yes No V <br />Could this seepage pose potential instabilin~? Yes No <br />PRINCIPAL SPILLWAY <br />1. Is the principal spillr~a~ ,tistem in worl:ine order? ~"es ~- No <br />?. Is the inlet free of debris and restrictive material? Yes `' No <br />;. Is the discharge oudet free of restrictve material? Y'es ~L No <br />a. Is erosion occurring at the discharge outlet^. Yes No L~ <br />Evaluate the sevenR: E.~Zensice iVloderate Just Starting None <br />EMERGENCY SPILLWAY <br />1. Is the overall emergenc!r ,~tllway system capable of passing design storm discharge'? <br />Yes ~~ No <br />? Daes_it appear as if the emergency ~~dhvay has discharged water since the last mspectian? <br />Yes No i.. <br />7 Is erosion occurring a any secuon of the emergency s~ilhvay° Yes No <br />Desrnbe the zcten[: <br />SEDfMENT STORAGE CAPACITY <br />I. Has the destgn s-tora;e capacity of the reservatr been surpassed? Y"es Yo <br />If yes. zxplain: <br />P1e:ue add any special comments concerning poteatirlly dangerous problems oo the back of this <br />SIICe[~ <br />Inspected bv: <br />