Laserfiche WebLink
STATE <br />311'Yftiz9 5 <br />p~,~r~}~y1(weight) Basis <br />phone: {303) 866.3567 Material weight : 2,100 pounds/LCY <br />F'~fi~rpa~~~liption <br />Earth - Loem <br />Rated payload : 75,000 pounds <br />Payload capacity : 35.71 LCY <br />V VArV <br />per Bowl (volume) Basis : o r v r s <br />Struck volume : 21.00 <br />r <br />Heaped volume : 31.00 G E Ir(1Q/~l <br />Average volume : 28.00 as :ArkFTr <br />Adjusted capacity : 28.00 tee: <br />produdbn reflects volume per spaper pair on pusf~~61s <br />OG <br />F <br />Cvcle Time : ob Conditlon Correctlons : Site altitude pi <br /> Scraper Push dozq>~„ ~ <br />Scraper loading tlme' : 1.80 minutes Altitude adj.. 1.000 NA owl: oi(6aiHB) <br />Maneuver and spread Ume : 0.60 minutes Job efficiency 0.830 NA <br />• load tlme per scraper pair on pusRpull models Net correction 0.830 NA <br />Travel time <br />Road condition descriptlon :Rutted diR, lAOe maintenance, no water, 2"tlre penetraSon <br />Haui Route <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)" <br />1 500 0.00 5.00 5.00 1887 0.38 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Retum route <br />Total scraper team cycle time (load + haul + maneuver and spread + return) <br />Unadjusted unit production/hour : 498.96 LCY/hour "' Adjusted for job conditions <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers <br />Adjusted single scraper team (unit) hourly production <br />Adjusted multiple scraper team (fleet) hourly producton <br />Haul time : 0.3d minutes <br />Retum gme <br />0.38 minutes <br />3.14 minutes <br />412.48 LCYltrour <br />2 scraper(s) <br />824.96 LCY/hour <br />824.98 LCY/hour <br />•• travel ems for each segment is adjustedfor acceleratbn/deceleration. <br />fable velocities era max. edainabfe per total resistance siw~m, not averege <br />