My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE68587
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE68587
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:14:11 PM
Creation date
11/20/2007 10:26:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006003
IBM Index Class Name
Permit File
Doc Date
6/20/2006
Doc Name
112c Decision Letter
From
DMG
To
Hall-Irwin Corporation
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CfRCES Coat Eatimatina Software <br />PROJECT IDENTIFICATION <br />Task #: 005 <br />Date : O6H9%2008 <br />User : ESC <br />State :Cokxado <br />Counly :Weld <br />Site :Parker-Dersham Site <br />PertniUjob # :III~Z008-003 <br />Abbreviation :none <br />Filename :M003-005 <br />Agency or organization name :OMG <br />Permit or otherjob ac8on ;New 112 <br />Task descrip8on : Rlp Sta <br />HOURLY EQUIPMENT COST <br />b Landscape Sales Areas <br />Basic machine :Cat D8R Series II - 8SU Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment rm. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3shank ripper <br /> Data source : (CRGj <br /> U81iza8on % <br />Cost Breakdown : Ownership cost/hcur : $53.92 NA <br />Dozer operating cosUhour: $75.29 100 <br />Ripper operating cosUhour : $7.98 100 <br />OperatorcosUhour: $32.53 NA <br />Total unit cosUhour : $169.72 Total Beet cost/hour : $189.72 <br />z. <br /> <br />MATERIAL QUANTRIES , <br />:. <br />~~ ~ ~~~~~~~~ <br />Selected estimating method : Area <br />Altemate methods - <br />Selamic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 8.50 acres Rip depth (ft) : 3.00 Volume : 41,140 BCY or CCY <br /> <br />Source of estimated quantity :DMG EsBmate <br />Source of estimated load factor :NA <br />HOURLY PRODUCTION <br />Altemate methods - ob Condig n Correction Factors - <br />Saismle : Seismic velocity ; NA feeUsecond Unadjusted production <br />Unadjusted production ; NA cu. ydsJhour per selected method : 2,905.25 cu. yds./hour <br /> <br />Area : Avg. dpping depth : 2.58 feeUpass Site aRitude : 4,950 feet <br />Average ripping width : 7.08 feeUpass AltRude adjustment : 1.00 (Cat HB) <br />Average ripping length : 100.00 feeUpass Jab efficiency factor : 0.83 (1 shiR/day) <br />Average tlozer speed : 88.00 feet/minute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.703 acres/hour Adjusted unit production : 2,411.36 cu. yds./hour <br />Unadjustetl production : 2,905.25 cu. yds./hour Adjusted fleet production : 2,411.38 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 1 dozers) <br />Unit cost : $0.070 per cu. yd. <br />Total job time : 17.08 hours <br />Total job cost : $2,898 <br />
The URL can be used to link to this page
Your browser does not support the video tag.