Laserfiche WebLink
BATTLE MOUNTAIN RESOURCES, INC. <br />December 08, 2005 <br />Mr. Allen Sorensen <br />State of Colorado <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />November 2005 Monthly Report <br />Dear Mr. Sorensen: <br />p~C 13 <br />The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. <br />(BMRI), San Luis Project for the month of November 2005. <br />Surface and ground water monitoring and analysis were completed for all required sites during <br />the month per the terms and conditions of the TR-32 Quality Assurance and Quality Control <br />(QA/QC) plan. <br />Vacuum on the tailing lysimeters was verified on November 30"', no water was present for <br />sampling and subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embankment piezometers and <br />the West Pit and tailings embankment monitoring wells were collected on Novemebr 30`". <br />November tailing impoundment piezometer measurements identified these installations were <br />either dry or contained less than ]2 inches of water as illustrated in Table 2. Tables 1 and 2 <br />below identify the depth to water measurements collected for each of the site monitoring wells, <br />piezometers and lysimeters as required by the terms and conditions of the TR-32 QA/QC plan. <br />The tailing impoundment collection pond underdrain flow was pumped intermittently during the <br />month to minimize the collection pond level. The leak detection system was measured on <br />November 30t°. The November tailings pond underdrain flow average was 27.10 gpm and a total <br />of 700 gallons of water was excavated from the leak detection system yielding a monthly average <br />of 20 gpad. <br />During November, the West Pit water treatment plant operated efficiently discharging a total of <br />9,015,200 gallons (27.67 acre-feet) of water to Rito Seco Creek and a total of 925,900 gallons <br />(2.84 acre-feet) of water was transferred from the water treatment plant to the tailings <br />impoundment. Seepage along Rito Seco Creek remained dry during the month. The monthly <br />precipitation accumulation for November was .23" inches, with the largest accumulation <br />occurring on November, l is' (0.19"). <br />P.O. Box 310 San Luis, Colorado 8 1 15 2-03 10 • (719) 379-0798 Fax (719) 379-0713 <br />