Laserfiche WebLink
LIST OF EXHIBITS <br />• <br /> Exhibit No. <br /> 13-1 Facilities Map <br /> 13-2 Surface Hydrology Map -Mina Area <br /> 13-2A Surface Hydrology Map - II-W South <br /> 13-3 Surface Water Control Plan -Tie-Across Haul Road <br /> 13-4 Watershed Boundary Partial <br /> 13-5 Proposed Sedimentation Pond 005 <br /> 13-5A Pond 005 As-Built <br /> 13-6 Pond 006 Phase II As-Built <br /> 13-6A Pond 006 Phase IV Subwatershed Map <br /> 13-66 Pond 006 Phase IV Design <br /> 13-6C Pond 006 Phase IV Pre-Settling Basin Design <br /> 13-6D Pond 006 Phase V Subwatershed Map <br /> 13-7 Proposed Sedimentation Pond 009 <br /> 13-7A Sedimentation Pond 009 As-Built <br /> 13-B Proposed Sedimentation Pond 015 12 sheets) <br /> 13-SA Proposed Sedimentation Pond 016 12 sheets) <br /> 13-88 Proposed Sedimentation Pond 017 12 sheets) <br />• 13-8PP Topsoil Stockpile PP Sumps PP-S1 and PP-S2 IAs-Built) <br /> 13-8Q0 Topsoil Stockpile QQ Sump QQ-S1 IAs-Built) <br /> 13-8RR Topsoil Stockpile RR Sump RR-S1 IAs-Built) <br /> 13-9 Pond 15 As-Built <br /> 13-9A Pond 16 As-Built <br /> 13-10 Typical Road Details <br /> 13-11.1-11.8 Tie-Across Haul Road IAs-Built) <br /> 13-12.1-12.4 Mine Entrance Haul Road 4As-Built) <br /> 13-13.1-13.5 Haul Road A IAs-Built) <br /> 13-14.1.14.3 Haul Road B <br /> 13-15.1-15.2 Haul Road C <br /> 13-16.1-16.2 Reserved <br /> 13-17.1 Reserved <br /> 13-18.1A Haul Road F IAs-Built) <br /> 13-19.tA-19.4A Haul Road G IAs-Built) <br /> 13-20.tA Haul Road H IAs-Built) <br /> 13-21.1A Haul Road I (AS-Built) <br /> 13-22.1 Plan and Profile, Haul Road J <br />• 13-23.1 Plan and Profile, Haul Road K <br /> 13-24.1 Proposed Haul Road L <br />iii Revised 6101 <br />