Laserfiche WebLink
L~_~ <br />l~ <br />SPECIFICATIONS FOR CONSTRUCTION OF DIVERSION CHANNEL <br />The channel is to be located at the fan level and as shown on Map 18. <br />Excess cut material will be plar_ed in three locations: 1) the fan <br />level bench; 2) waste disposal area; and 3) temporary coal storage area. <br />This material will improve the stability of the fan level due to improved <br />drainage. An employee parking area will be constructed in the temporary <br />coal stcrag2 area after placement of material. An initial bench will be <br />constructed at ~:~aste disposal area. <br />Topsoil will be segregated, stored and redistributed for reveoetation <br />within the channel. <br />Rip rap will be used throughout the low flow channel as siio~,~~n on <br />~~?ap 18. Sizes and quantity are as directed by CWI's civil engineer. Gabions <br />are required at east end of channel by BLM. <br />All stioulatioris of Federal Lease, USGS t•?ine Plan, and right-of-v:ay <br />permit must be adhered to. <br />.~ <br />