Laserfiche WebLink
<br />RECLAMATION COST SUMMARY tont'd <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through P): (22,394 <br />11. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item #~ Item Description <br />1. ~ Public Liability Insurance..... <br />2. ~ Contractor's Performance Bard.. <br />3. ~ Contractor's Profit............ <br />4. ~ Job Superintendent.. <br />~ Cost (f) <br />1.550% of directs f347 <br />O.BbOX of directs f193 <br />10.00% of directs 52,239 <br />Subtotal (A): f2,779 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): 525,173 <br />B. DNG PROJECT ADMINISTRATION EXPENSES <br />Item #~ Item Description ~ Cost (f) <br />1. ~ Minerals Program Admin. Fee at 5.00% of Intr. ~ (1,259 <br />Subtotal (B): 51,259 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): (4,038 <br />____________ <br />NET INDIRECT COST PERCENTAGE: 18.03% <br />TOTAL PERFORMANCE BOND AMOUNT (DIRECT plus INDIRECT costs): (26,432 <br />111. BOND STATUS -- BOND RELEASE SUMMARY <br />________________________________________________________________________ <br />________________________________________________________________________ <br />sheet 10 of 10 <br />