Laserfiche WebLink
l;olorado Departmrnt of Public Health and Environment <br />Air Pollution Control Division Page 4 of 6 <br />- MIPIING OPERATIONS - <br />I. PROCESSING <br />Will processing (i.e., crushing, screening, etc.) occur on site? No <br />NOTE: ALL PROCESS EQUIPMENT REQUIRES A SEPARATE PERMIT APPLICATION AND <br />ADEN. <br />PRIMARY CRUSHING <br />Max®rm loos crushed per year. N/A Tons <br />Ma~tm roffi cruhed per hour: Tons <br />Hours of cnuhinB Pn ~Y <br />Proposed Controls: <br />Q Moist Material <br />^ Water spray <br />^ Enclosure Type: <br />^ Other (specify) <br />Tons. <br />Tons. <br />SECONDARY CRUSHING RESCREENING/CI.ASSIFYYING <br />Maxim roes crushed per year. N/A Tons Maximum tons screened per year. N/A Tons <br />Masmn~ rons crashed per hour: Tons Maximum tons screened per hoar. Tons <br />Hants of cnuhing per day: Hours of screening per day. <br />Proposed Connols: Proposed Controls: . <br />^ Moist Material' ,~ ^ Moist Material <br />Q Water Splay `~ ^ Water Sprny <br />^ Enclosure Type: ^ Enclosuro Type: <br />^ Other (specify) ^ Other (specify) <br />J. <br />Tons Of Material Conveyed Per Ye <br />Tons Of Material Conveyed Per Day <br />Proposed Controls <br />`" ^ Enclosure Type: <br />® Other (specify) <br />Number Of Transfer Points <br />Proposed Controls <br />^ Enclosure Type: <br />^ Water Sprny <br />^ Chemical Stabilizer <br />® Other (specity) <br />(Complete or Partial) <br />SCREENING/CLASSIFYING <br />Maximum tons screened per year. N/A <br />Maximum tons screened per hour. <br />Hour of screening per day: <br />Proposed Controls: <br />^ Moist Material <br />^ Water spray <br />^ Enclosure Type: <br />^ Other (specify) <br />ar 1,500,000 <br />13,000 <br />Moist material <br />10 <br />Moist material <br />(Idleate On A Separate Diagram How Conveyor System is Set Up) <br />(Cotuplete or Partial) <br />Tons <br />Tons <br />Revised July 2001 htm•//www.cduhe.state.co.us/an/stationatv.asn <br />