My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE68410
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE68410
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:14:02 PM
Creation date
11/20/2007 10:21:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003091
IBM Index Class Name
Permit File
Doc Date
7/28/2003
Doc Name
Fugitive Particulate Emissions APEN
From
Lafarge West Inc
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Depatmxnt of Public Health and Environment <br />Air Pollution Control Division <br />- - -MINING OPERATIONS - <br /> <br /> <br /> Year For Which Actual Data Applla: <br /> <br /> <br />Pollutant Estimated Emissions <br />(tons/yr) at throughputs <br />requested <br /> <br />Actual Emissionsv <br />Fro <br />Data Yeaz <br />Estimation <br />Method. <br /> Controlled Uncontrolled m <br />Particulate ' <br />PM-10 <br />A. TOPSOIL REMOVAL <br />Maximum Tons Removed Per Day: 5,000 <br />Tons Removed Per Yeaz: 50,000 <br />Proposed Controls For Topsoil Removal: • h. <br />®Moist Material <br />^ Water Spray <br />' ^ Other (specify) .,;,;;_ <br />B. ~ TOPSOIL STOCKPILE(S) <br />Maximum Stored At One Tithe: 50,000 Tons <br />Proposed Controls For Topsoil Stockpile: <br />^ Watering Times/Day <br />~. ^ Chemical Stabilizer > <br />®Compacting Of Piles <br /> <br />C. OVERBURDEN REMOVAL <br />Equipment Used For Removal: -~a. Scraper <br />Maximum Tons Removed Per Day By Dragline: 0 <br />Tons Removed Per Yeaz By Dragline: 0 <br />Number Of Scraper Hours Per Day: 12 <br />Number Of Scraper Hotus Per Yeaz: 200 <br />Proposed Controls For Overburden Removal: <br />..s_ ®Moist Material <br />^ Water Spray <br />^ Other (specify) <br />Page 2 of 6 <br />_> <br />^ Enclosures Type: (Complete or Partial) <br />® Revegetation Revegetation Must Occur Within One Year Of Soil Disturbaace <br />^ Otlter (specify) <br />,. <br />Itnisedtuly2001 httn://vvww.cdohe.state.co.us/an/stationarv.asn <br />
The URL can be used to link to this page
Your browser does not support the video tag.