My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO29096
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO29096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:48:08 PM
Creation date
11/20/2007 10:20:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Hydrology
Doc Date
1/5/1998
Doc Name
STORMWATER ANNUAL REPORT FOR BLUE MOUNTAIN ENERGY INC DESERADO MINE FACILITY COR-040172 REPORT PERIO
From
BLUE MOUNTAIN ENERGY INC
To
DMG
Permit Index Doc Type
NPDES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'STQRMWATER ANNUALREPORT -METAL 1vm~TIIVG (& COAL) <br />COLORADO DEPT. OF PITBI IC SEALT'3 & ENVIItONMENT <br />Wtuer ~u:~ir;:.^,,;fc.:,--ol Division <br />Denver, Colorado 80222-1530 <br />Please print or type. Fill in etch section. <br />Permittee (Company Name): -SLID f./~D U t.l'1~ i tl ~-JE IZ.b~ <br />Facility Name; _ DEh E 21-4~C~ I~/l l U E <br />Facility Address: '3[90"7 Cr~uuT4 #~cG (~S <br />Rapt ,r~ ~ co S~ILo~fB <br />Facility Phone Number (~) l~~7 S - $'-i 3 1 <br />Permit Certification No. COR-040 ~ ~l 2 <br />Reporting Period: Jan. 1-Dec. 31, 19 9 -7 <br />A. A report on t/te facility's overall rnmpliance with the SWMP. (Include here a summary of any measures <br />taken to comply with your Stotmwater Management Plan (SWMP), to fully implement it, changes or <br />improvements made in any of your Best Management Practices (BMPs), problems encountered, spills, <br />other potential violations, etc.) <br /> <br />Were changes made to your SWMP? ®No ^ Yes -Describe changes on a separate sheet. <br />B. A summary of each comprehensive stormwater facility inspetxion made, including date, findings, and <br />action rakett. (The permit requires at least two comprehensive facility inspections per year -see page LO <br />of the permit. Include here a summary of those inspections, plus any other comprehensive inspections <br />made. It is not necessary-to summarize day-today inspections, unless significant problems were noted.) <br />First Inspection -Date _/ / F'mdings, and action taken: <br />II.tSPE~-rlot~l A2~ IrlcLU0E7 IN Qul~ - <br />N101~.t'rb4~-mot ~ti4V11ZDllAl(Ef~LT6.L Cr~t,~(ULI~t~~F <br />I~S~FGTIOtis - <br />'Note -form may lx reproduced Page 1 of 2 art troamin <br />
The URL can be used to link to this page
Your browser does not support the video tag.