Laserfiche WebLink
.,-~_~: <br />ESTIMMTING FORM - REVEGETATION YORK cont'd <br />B. SHRUB 8 TREE TRANSPLANTS <br />SPECIES NANE I DUAN./ACRE ~ STOCK TYPE 8 512E <br />No transplants required <br />C. SEEDBED PREPARATION <br />Tilling method #1: chisel plowing • <br />#2: <br />D. SEED APPLICATION <br />____________________ <br />____________________ <br />Seeding method: broadcast seeding ('93 contr. data) <br />253.95 <br />Total cost/acre: 553.95 <br />Total cost/acre: f150.00 <br />E. FERTIL121NG <br />_______________ FERTILIZER / SOIL AMENDMENT I UNITS/ACRE I UNIT I E/UNIT I f/ACRE <br />Materiels used #1: No fertilizer/amendnents required ~ ~ ~ ~ 50.00 <br />#2: <br />#3: <br />____________________________________'____________~_____ ____°~______°__~_ =c==°~=___________° <br />Total materiels cost/acre: 50.00 <br />Application method #1: No fertilizer appliceti on required 50.00 <br />#2: <br />F. MULCHING <br />MULCH / NETTING / OTHER MATERIALS <br />Materials used #I: No mulch materials required <br />#2: <br />#3: <br />#4: <br />Application method #T: No mulch application required <br />#2: <br />#3: <br />G. JOB COST <br />_=====vcv=== <br />Total area to be seeded: 1.00 acres. Total f/acre <br />Estimated failure rate: 50.00% of area. Total f/acres <br />• Reseeding cost items: A D <br />Filename M081-2 sheet 2 of 2 <br />MATERIAL:I PLANTING: I S/PERT. ~ TOTAL I TOTAL <br />S/PLANT ~ S/PLANT ~ PELLET ~ f/PLANT ~ f/ACRE <br /> 50.00 <br />Total transplant cost/acre: 50.00 <br />Total application cost/acre: 20.00 <br />UNITS/ACRE ~ UNIT I f/UNIT I S/ACRE <br />f0.00 <br />Total materiels cost/acre: f0.00 <br />f0.00 <br />Total eppl ication cost/acre: 50.00 <br />f440.80 <br />_________ Total initial Job Cost= <br />_ (440.80 <br />___________ <br />_________ <br />5386.85 <br />Total _ <br />Reseeding Costs = ___________ <br />(193.42 <br />GRAND TOTAL JOB COST = 2634.22 <br />