My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO29082
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO29082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:48:08 PM
Creation date
11/20/2007 10:20:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
Hydrology
Doc Date
4/12/2004
Doc Name
1st Quarter 2004 Quarterly Pond Inspection Reports
From
J.E. Stover & Associates
To
DMG
Permit Index Doc Type
Sediment Pond Inspections
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUARTERLY POND INSPECTION REPORT <br />Identitication <br />During Inspection: <br />mate Water Level <br />nt (% total storage) <br />(cfs) <br />Rills 8 Gulleys <br />Inadequate Vegetation <br />Outlet Channel Erosion <br />Burrows <br />Lodestar Ener ,Inc. Quarter: <br />McClave Can on Mine C-80-004 Inspection <br />Sediment SAE 1 SAE 2 SAE 3 I <br />Pond Office To soil Soil <br />Pool D D p <br />0% 0% 0% 0% <br />0 0 0 0 <br />No I No <br />Differential Settling <br />Cracks or Slides <br />Seepage <br />purtenant Structures <br />Defective Spillways No No <br />Dewatering Devices Clogged No No <br />Faulty Gates, Etc. No No <br />Comments Water in sediment pond is 1.4' below primary spillway. <br />Office silt fence is in good shape. <br />Required: The topsoil stockpile silt fence needs to be 16•feet long. <br />A trench needs to be constructed behind the soil stockpile s~t~errce <br />water running through the silt fence can drain to the wesy•nr,0 a R i <br />,~..°° <br />0'~O ,' c E. <br />oflnspector: Jim Stover <br />P. E. <br />
The URL can be used to link to this page
Your browser does not support the video tag.