Laserfiche WebLink
-3- <br />6) a) Pursuant to 34-32.5-118(5) of the Act, the Board has a right of entry to reclaim the <br />lands affected by the operation, or to mespond to an emergency as defined by C.R.S. 34-32.5-121(2). <br />b) The Board will emrter the lands to perform reclamation only if the Board has <br />determined: <br />not been perfornmed, and <br />i. that reclamation required by law to Dave been perfommed upon such lands has <br />ii. that financial warranty forfeiture proceedings described in the Act or similaz <br />provisions of subsequent laws, if any, have been initiated. <br />c) The Division, acting for the Board, will enter lands to respond to an emergency only <br />where the Division determnines that any of the conditions of Construction Material Rule 8.4.2. exist. <br />7) The additional conditions set forth in the attached rider, if any, aze incorporated herein by <br />reference. <br />/-/ a) Rider is attached. <br />/~XJ b) No rider is attached. <br />MINED LAND RECLAMATION BOARD <br />COLO DEPARTMENT OF NAT.U~RA~L~RESOURCES <br />RONALD W. CATTANY l <br />Division Director <br />