Laserfiche WebLink
<br />RECLAMATION TIME TABLE <br />Year One thru Three <br />Sandstone overburden will be hauled and backfilled into Area A <br />from Area 1. Sandstone overburden will be stripped from Area 6, <br />hauled and stockpiled in area B. This is to be done during phase <br />1 of the mining plan. <br />Year Four thru Eight <br />Sandstone overburden will be hauled and backfilled into Area 1 <br />from Area 2. Overburden from Area 7 will be hauled and backfilled <br />into Area B and 6. This is to be done during phase 2 of the <br />mining plan. <br />Year Nine thru Thirteen <br />Sandstone overburden will be hauled and backfilled into Area B <br />• and 6. This is to be done during phase 3 of the mining plan. <br />Year Fourteen thru Nineteen <br />Sandstone overburden will be hauled and backfilled into Area A <br />and 2 from Area 3. This is to be done during phase 4 of the <br />mining plan. <br />Year Twenty thru Twenty-four <br />Sandstone overburden will be hauled and backfilled into Area 5, <br />7, and 3 From Area 4. This is to be done during phase 5 of the <br />mining plan. <br />Year Twenty-five thru Twenty-nine <br />Sandstone overburden piles in Area 5, 6, 7 and corresponding <br />portion of section A will be hauled and graded to a slope of <br />2 to 1 following the existing easterly sloping terrain. Seeding <br />of a mixture of Bittergrass, Mountain mahogany, Rabbit brush, <br />