Laserfiche WebLink
• TYPE TOTAL (acres) <br />Phase Two (Approx. 6 Years) <br />Major 89.0 <br />Moderate 21.5 <br />Minor 53.7 <br />Phase Three (Approx. 3 Years) <br />Major 37.8 <br />Moderate 21.5 <br />Minor 142.7 <br />Phase Four (Approx. 1.5 Years) <br />Major 21.5 <br />Moderate 20.0 <br />Minor 160.5 <br />"' Major, moderate and minor disturbance as per DMG rules and regulations. <br />A total of 202 acres within a 213 acre property will be disturbed. <br />• The total azea of disturbance by mining phase for reclamation considerations includes both azeas of <br />moderate and major disturbance. This is summazized in the following table. <br />TABLE D-2 <br />TOTAL DISTURBED ACREAGES BY PHASE (MODERATE AND MA]OR): <br />Phase One 75.2 <br />Phase Two 110.5 <br />Phase Three 59.3 <br />Phase Four 41.5 <br />9 <br />K~A <br />