Laserfiche WebLink
.1 <br />DEPARTtitENT OF NATURAL RESOURCES ~ ? <br />Davitl H. Getcnes, 6ecutrve Duec mr 4 <br />c' ~ . <br />f?-3i~~D LA~lf3 ~3~~~AJlr4~ {~f~ DfVlSf©f><i ,f, `,; <br />DA41D C. SH .LTC'N, Director _ /..-y~'`a ~, <br />R~chartl D. Lamm <br />Governor <br /> <br />• <br />h'r. Ed Moyer <br />Geologist <br />Coloo-ryo Coal Company <br />5731 State Highvray 1.3 <br />{4eeker, CO 81F41 <br />Dear tlr. Moyer: <br />~~ GJ ~~~1 <br />JUN 2 0 i9~~ ~ <br />1 <br />cot.owro cost. co;~:Pat•;~r <br />LANDIRECLi,MAT10:`! G.FT. <br />The Division hereby approves/yes the tee-i/minor revision listed <br />below. <br />Operation: Colot•ryo Mine Approval! Date: June 12, 19II5 <br />Pe snit No. C-019-H1 <br />Operator: Colowvo Coal Comranv <br />Address:_~7~1 State Hinhi•lav t'i <br />Type of t4ine: Surface X UG . <br />Federal X Private <br />Increase in Disturbed Area: <br />Yes ~_ No <br />Mee{:er, Colorado 81Ca1~Acreage of Increased Disturbance: 2_0 <br /> <br />Bond Increase Required; Yes _ Pio X <br />/.,~`r~`l Amount of Increase: <br />Specialist: CandacelJt•1. Thompson Publication Required: Yes No X <br />Erief Description of Revision and Comments: <br />Slide stabilization on haul road t•+ith stipulation. <br />StiDUlation No. 1 <br />Colotvyo Coal Company will submit by October 1, 1935, a written narrative or raps <br />as appropriate detailing the present status of the slide stabilization measures, <br />observations on success or lack of success of the slide stabilization process, <br />any problems encountered, and remedial measures ta{~.en to solve them. <br />(1/33) <br />Doc, ho. 130 <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado b0203 Tel. (303) E66-3567 <br />