Laserfiche WebLink
• EXHIBIT 17 <br />HAUL ROAD AND FACILITIES MODIFICATIONS <br />( 1) November 19, 1984 - Taylor Creek Diversion. <br />( 2) May 23, 1985 - Minor Revision to Construct an Additional Truck Runaway <br />Ramp on the Access Road. <br />( 3) June 12, 1985 - Minor Revision to Stabilize a Debris Slide on the <br />Access Road. <br />( 4) May 23, 1986 - Relocation of Water Lines. <br />( 5) October 10, 1986 - Loadout Expansion. <br />( 6) December 22, 1986 - Modification to Access Road in Vicinity of the <br />Loadout. <br />( 7) September 1, 1983 - Technical Revision for Construction of Stoker Coal <br />Siding and Sediment Pond Pt. 005. <br />( 8) November 7, 1984 - Technical Revision to Construct Gossard Loop Pond <br />Pt. 006. <br />• ( 9) June 14, 1985 - Technical Revision to Construct Gulch A Pond Pt. 004 <br />and Relocate the Upper Goodspring Creek Monitoring <br />Location. <br />(10) June 14, 1985 - Technical Revision to Modify Streeter Gulch Sediment <br />Pond Pt. 001. <br />(11) April 14, 1987 - Minor Revision to Modify Paved Haul Road. <br />(12} April 7, 1986 - Status Change for West Pit Disturbed Area Incidental <br />Boundary Change. <br /> <br /> <br />