My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE68141
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE68141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:13:49 PM
Creation date
11/20/2007 10:13:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983109
IBM Index Class Name
Permit File
Doc Date
7/1/1983
Doc Name
LIMITED IMPACT 110 & SPECIAL 10-DAY APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- .~ • -3- • <br />5.i7!I97T C - :~fa p <br />This ,.Np should clearly define t.'^.e per;nit bevndaries and contain sufficient information <br />to deter-une the Location of the affected lard on the around and existing and proposed <br />roads or access routes to be Lsed in connection with the mining operation. A11 <br />_,-,nediately adjacent I=ndo:~r,-rers of record .-~cst be s;~or:~n. .he oLarter section corner, <br />section Line, or any ot;-er locatable points should also ;.e sho;.~n on this map. <br />c;{dI97T D - Flildlife, ;aa ter Resources, L"e cetati on and Soils Information <br />i•'ach of the above-mentioned subjects must be addressed as outlined in the applicable <br />RULE. <br />.~.~?I9TT E - n'e clama ti on PIan <br />As with the mining plan, this should be a ceneraZ discussion of the methods, equiprent, <br />phases or stages of the reclamation process and those portions of Land affected by each. <br />If possible, the plan should be closely correlated with the map, If not, the narrative <br />must be comprehensive enough to draw an accurate verbal picture of the expected appear- <br />ance of the area after completion of reclamation. <br />EXfIIBIT F - Proof of Compliance with Local Government Zoning <br />In accordance with 34-32-1I5(4)(e), the Board must make a finding that the operation <br />will be in compliance with Local zoning or subdivision regulations. You are not <br />required to submit this information, but a submission would assist the Division's pro- <br />cessing of the application. When the Division notifies the Ioca1 government of the <br />existence of this application, it will request information regarding compliance with <br />applicable Local Law. It is intended that operators may concurrently come into compli- <br />ance with local requirements at the same time the Division is processing this applica- <br />tion. Information regarding the status with local government will be helpful. <br />EXHIBIT G - Source of Leoa1 Right to Enter <br />This could be a copy of the Lease, deed, abstract of title, or current tax receipt. <br />An acceptable alternative would be a statement acknowledged by a notary public that the <br />operator has the Legal right to enter and mine. <br />EXHIBIT H - Reclamation Costs <br />Fora lI0 permit, if the operator requests financial warranty to be Less than 55,000.00, <br />the operator must submit facts to support such a request. Otherwise, a financial warranty <br />of 55,000.00 will automatically be set. For aI1 III permits, the financial warranty shall <br />be 52,500.00 per acre. <br />EXHIBIT I - Terms of Governmental Contracts (111 Applications only) <br />For Special 'IO-Day (I11) permits, the operator must submit a copy of the contract or <br />other proof that proves the necessity of a special i0-day permit. The operator must also <br />submit evidence of the financial warranty provided under the governmental contract, if <br />it was repaired. <br />
The URL can be used to link to this page
Your browser does not support the video tag.