Laserfiche WebLink
Central Appalachia Mining, LLC <br />Water Sampling Report <br />Date: 06-21-05 <br />Weather Conditions: Clear - 95 degrees F. <br /> Surface Water <br />Sample <br />Point Time Flow <br />cfs pH EC <br />umhos/cm Temp (C) <br />SW-1 2:21 PM 9.9 8.0 1600 24.7 <br />SW-2 2:58 PM Dry - - - <br />SW-3 1:24 PM Dry - - - <br />SW-4 12:57 PM 4.4 8.2 1800 23.2 <br />SW-5 3:00 PM Dry - - - <br />SW-6 1:45 PM Dry - - - <br />SW-7 1:33 PM D - - - <br />SW-8 1:10 PM 9.9 8.0 1700 22.7 <br /> <br /> Ground Water <br />Sample <br />Point Time SWL <br />feet pH EC <br />umhos/cm Temp (C) <br />GW-1 2:07 PM 6.5 7.5 2200 16.7 <br />GW-3 1:20 PM 36.4 7.1 3100 36.4 <br />GW-6 1:47 PM Dry-18.8' - - - <br />Second Quarter 2005 <br />Sampled by: Jim Stover <br />Meters Calibrated: Yes <br />Location of Points/VVells <br />SW-1 East Salt Creek above McClane under haul road bridge <br />SW-2 McClane Creek at culvert below mine <br />SW-3 Munger Creek at haul road culvert below mine <br />SW-4 East Salt Creek -2 miles downstream of SW-8 <br />SW-5 McClane Creek above mine site at culvert inlet <br />SW-6 Munger Creek below mine before north split <br />SW-7 Munger Creek above Mine <br />SW-8 East Salt Creek between Munger and McClane Creeks at bridge <br />SW-X McClane Creek at confluence with East Salt Creek <br />GW-1 Alluvium of East Salt Creek about 3 Miles above McClane - TD 14.3' <br />GW-3 Alluvium of East Salt Creek just below Munger Canyon - TD 47.3' <br />GW-6 fn Munger Canyon at the permitted waste rock disposal area - TD 18.8' <br /> Feet <br />GW-1 Total Depth 14.3 <br />GW-3 Total Depth 47.3 <br />GW-6 Total Depth 18.8 Depth revised when pipe was damaged <br /> during gob pile construction. <br />