Laserfiche WebLink
• <br />EXHIBIT L <br />RECLAr.TATION COSTS <br />SLAB CAPJYON LIbRESTONE QUARRY <br /> <br />The major costs of reclaiming the land will involve the <br />movement of overburden from the area being quarried to the <br />mined-out portions of the property where it will be used as <br />fill. These costs are considered to be a mining expense. <br />1, n4iixor costs for reclamation will be involved in <br />., smoothing up the surface and reducing near vertic~.l quarry <br />faces to moderate slopes. If soil is encountered during <br />.' mining, the stockpiling and subsequent transfer of it tc <br />3 desirable areas where it will be seeded and fertilized, <br />~, will involve moderate costs. <br />}, Estimated costs for reclamation vaork at other quarries <br />has been about $450 per acre. Ideal's reclamation costs <br />~.,' at Slab Canyon are expected to be lower than average. <br />i <br /> <br /> <br /> <br /> <br /> <br />e <br />s, <br />~' <br />e <br />t~ <br />