Laserfiche WebLink
1 <br />1 <br /> <br />l <br />J <br />1 <br /> <br /> <br /> <br /> <br />1 <br /> <br /> <br />1 <br />1 <br />1 <br />1 <br />• <br />SLAB CANYON LIP.4ESTOPJE QUARRY EXHIBIT D Pace <br />OverUurden removal and the mining of limestone mill be con- <br />ducted simult•:neously, but in different areas. 'thus, as shornt <br />on F'a:hibit C, the northern 1ta] f of ,he 100-foot r7iil~ atrip <br />IJo, 1 has berm cleared of overburden. She limeaton~ •,~i1L be <br />drilled and i,lasted shorty. '.'!bile limestone is bein~~ p'oduced <br />from the northern half of the strip, the overburde^ r.il7 'ue re- <br />moved from the scuth half. Tl:e south half of strip No. .. trill <br />be readied for the removal of the limestone by the tirnc° ,lte nor~h <br />half ono hoes exhausted. IVhen the limestone is being I.rrdu.ced <br />from the south half of strip Ilo.l, fire overburden rerr~rvn] pro~~~ss <br />t=ri] 1 ad'/?n~:e to Live north half of strip CIo. ,'_ an~9 i,he brc':en sr,nd- <br />stone r:,aterial cast or hauled to the void created by the remuv?1 <br />of limestone frost the north half of strip Ho, 1. The :e rrccedures <br />vaill co;ttinue urrLil the reserves of limestone are dealeted, <br />Under current demands, Ideal will require approximately <br />60,000 tone of this material per year. This will involve the <br />disturbance of about one acre of land. <br />Tlic minis„ epcration eaill involve the st~t,rdarJ qu:irr;~ equip- <br />rccnt. Air drills to provide the •leeded holes for er.plo;ives; <br />poa~er shovels and end loaders to move and load the i~roken nrltrrials, <br />a dozer rand road ^rader to mointain :ire ~workinr; areas, ar.l haulaTr <br />reads at,d tru:ks ,o move the material about the quarry and to fire <br />eernent plant at Goettcher, :;here it sill be crushed anal r~•ocessed <br />into Portland Cement. <br />'.here ir. nit :surface or ground ;~utor pre;r~nt at the qu:n•rf. <br /> <br />