My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO28982
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO28982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:48:03 PM
Creation date
11/20/2007 10:11:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Hydrology
Doc Date
9/14/2001
Doc Name
3Q 2001 Sediment pond inspection
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BASIN RESOURCES, INC. , <br />SEDIMENTATION POND INSPECTION FORM <br />Pond Gdzsi`F~or`i4.~_~i,~r~riNY~ ~ ~ NPDESNo. /~sU-t- <br />Date of Inspection_ S~zp't-L~F ~ ~c0 / __ <br /> <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: Excellent, odemte <br />2. Erosion forming gullies: Extensive, Some, <br />3. Is wave action posing erosion: <br />On the upstream embankment? <br />At the principal spillway inlet? <br />~. Erosion of the downstream tce of the embankment? <br />The cause of [he erasion is attributed to: <br />Few, Poor <br />e F None <br />Yes No y <br />Yes f~~ No <br />Yes No_~ <br />5. Is seepage occurring through the dam? <br />Could this seepage cause potential insmbility'' <br />PRINCIPAL SPILLWAY /°J~ SPi~~u'~'-~ <br />1. Is the principal spillway system in working order^. <br />2. Is the inlet free of debris and restrictive material" <br />Yes Na V <br />Yes No <br />Yes No <br />Yes No <br />3. Is the discharge outlet free of restrictive material? Yes No <br />a. Is erosion occurring at the discharge outlet' Yes No <br />Evaluate the seventy: E.aensne Moderate Just Starting None <br />EMERGENCY SPILLWAY ~! cis?~k,~°~ S~~au-/3 <br />1. Is the overall emergency spillway system capable of passrftg design storm discharge'? <br />Y'es No <br />?. Does it appear as if the emergency spillway has discharged water since the last inspection? <br />Yes No <br />3. Is erosion occurring a[ any section of the emergenry spillway? Yes No. <br />Describe the extent: <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design storage capacity of the reservoir <br />If ees, explain: Vic: 5 ~ n -' r: <br />surpassed" Yes No ~ <br />Please add :my special comments concerning potenrially dangerous problems on the back of [his <br />sheet! ~ '' <br />Inspected by: ~,,/ ~Lc'~'- <br />
The URL can be used to link to this page
Your browser does not support the video tag.