Laserfiche WebLink
Memo to Larry Oehler 2 December 22, 2004 <br />DMG has determined that construction of the proposed slurry wall in accordance with the draft <br />specifications provided with the November 22, 2004 submittal should result in a wall that meets <br />leakage performance standazds established by the State Engineer. Hence, this permit application, <br />once approved, will be eligible for the 20 percent slurry wall bond. If the final specifications are <br />different in any way from the draft specifications, DMG must be provided a copy of the final <br />version. Also, the Applicant must provide a written commitment that mining will not intersect <br />ground water (within the areas to be walled) until the DMG has reviewed and accepted the final <br />slurry wall construction report, including quality assurance test results. <br />co: Carl Mount, DMG (via email) <br />c:\acs\LOANER MACHINEU1y Documents\Tucson South 2.doc <br />r <br />