My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE68067
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE68067
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:13:43 PM
Creation date
11/20/2007 10:11:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992058
IBM Index Class Name
Permit File
Doc Date
11/4/2003
Doc Name
FWR Calculation
From
BLM
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION BOND EVALUATION WORKSHEET <br />SERIAL OR FILE NUMBER: COC-67276 MRLD NO. M-92-058 <br />PROJECT NAME OR IDENTIFIER: MICA WHITE MINE, <br />COLORADO QUARRIES, OWNER <br />JOB DESCRIPTION: [1] P1T RECLAMATION <br />[2] ROAD RECLAMATION <br />BASIC CONDITIONS AND ASSUMPTIONS: <br />PIT RECLAMATION. The final configuration of the pit as planned by Colorado Quarries is shown on the <br />attached Map. The shape in Plan will be an elongated oval. The overall average dimensions will be <br />approximately 815 feet long by 300 feet wide, which total approximately 5.7 acres. It will consist of a <br />number of benches, shown on the map, with a pit floor of approximately 2.0 acres. <br />Because of narrow bench width, dozer size will be restricted to no larger than a John Deere 550 or a <br />Caterpillar D-4. In these calculations, it is assumed that each bench with south-facing slope (8'-10' wide) <br />would require 2 passes with adozer-pulled ripper, one going to the end of the bench and one returning. (For <br />these benches, the two passes would overlap). Each bench with north-facing slope (12" wide) also will <br />require 2 passes with adozer-pulled ripper (these will not overlap or will overlap slightly). Maximum <br />assumed speed would be'h mph [44 ft./min]. A 2 minute turn-around time is assumed in moving up or down <br />from one bench to another. 75% efficiency also is assumed. <br />To simplify calculations the bench area was divided into 11 blocks, which were overlain on Map I (but not <br />included herein). Blocks on south-facing slopes will require 2 passes with the dozer; blacks on northfacing <br />slopes will require 3 passes with the dozer. Dozer time was calculated separately for each block and then <br />totaled. This was then multiplied by the cost/minute to get asub-total for each block. <br />The pit floor was arbitrarily divided into 15 12-foot wide strips for purposes of calculation. Because of <br />overlap of dozer passes, it was assumed that each strip would require 2'/x passes of the dozer. II also was <br />assumed that 2 minutes would be used to turn around at the end of each pass, and because of the fairly flat <br />surface, an efficiency of 80% was assumed for this part of the operation. <br />Machinery costs estimates were provided by Colorado Machinery, 685 Enterprise Drive, Pueblo Wert, <br />81007. Estimate used John Deere Model SSOH, renting at $300.00 per day. <br />JOB DESCRIPTION: UNIT COST NUMBER OF UNITS SUBTOTALS/ <br />PIT RECLAMATION TOTAL <br />BLOCK A $300/day @ 8 11 benches totaling 1369 feet @ 44 <br />DOZING & hrs/d = $0.625 ft/min X 2 = 62 mins + 12 mins $60.00 <br />RIPPING per minute [75% efficiency] + 22 mins [turn- <br />BENCHES around time] = 96 minutes <br />BLOCK B 13 benches totaling 2479 ft @ 44 <br />DOZING & Same as above ft/min X 2 = 112 mins + 22 mins $100.00 <br />RIPPING [75% efficiency] + 26 mins [turn- <br />BENCHES around time] = 160 minutes <br />BLOCK C 13 benches totaling 1319ft @ 44 <br />DOZING & Same as above ft/min X 2 = 60 mins + 12 mins $61.25 <br />RIPPING [75% efficiency] + 98 mins [turn- <br />BENCHES around time] = 64 minutes <br />
The URL can be used to link to this page
Your browser does not support the video tag.