The 12 sites that will not require bonding for surface or road disturbance aze:
<br />Drill Site
<br />
<br />Number ~/,,'/4, Sec. Township, Range Depth (ft)
<br />WP-07-O1 SW. SE, 9 3N, 93W 380
<br />WP-07-02 SE, SW, 9 3N, 93W 380
<br />WP-07-03 SE, SW, 9 3N, 93W 330
<br />WP-07-04 NW, NE, 16 3N, 93W 390
<br />WP-07-05 NE, NW, 16 3N, 93W 1100
<br />WP-07-Ob NW, NW, 16 3N, 93W 330
<br />WP-07-07 NE, NW, 16 3N, 93W 440
<br />WP-07-08 SW. SE, 9 3N, 93W 380
<br />WP-07-09 NE, NW, 9 3N, 93W 350
<br />WP-07-]0 SW. SE, 9 3N, 93W 390
<br />WP-07-11 SE, SW, 9 3N, 93W 340
<br />WP-07-12 NE, NW, 16 3N, 93W 380
<br />Tota I 5,190
<br />Out of these 12 drill holes, only WP-07-O5, WP-07-06, WP-07-07 will require downhole
<br />plugging since the rest of the WP series holes will not be drilled below the lowermost F seam
<br />to be mined by the West Pit. These holes will be left open with a rock covering the top of
<br />drill hole and will be mined thru during the course of mining activities.
<br />The proposed exploration program will require construction of 25 drill locations that will
<br />require site reclamation.
<br />The 25 sites that will require bonding for surface site disturbance aze:
<br />Drill Site '/<,'/<, Sec. Township, Range Depth (ft)
<br />Number
<br />ST-07-O1 SE, NW, 17 3N, 93W 550
<br />ST-07-02 NE, SE, 17 3N, 93W 480
<br />ST-07-03 NW, SW, 17 3N, 93W 410
<br />ST-07-04 SW, SW, 17 3N, 93W 650
<br />ST-07-05 SE, SW,17 3N, 93W 350
<br />ST-07-O6 SW, SE, 17 3N, 93W 500
<br />ST-07-07 SE, SE, 18 3N, 93W 950
<br />ST-07-08 SW, SW, 17 3N, 93W 600
<br />ST-07-09 SE, SW,17 3N, 93W 600
<br />ST-07-10 NW, NW, 20 3N, 93W 575
<br />ST-07-11 NE, NE, 19 3N, 93W 950
<br />ST-07-12 NW, NW, 20 3N, 93W 525
<br />N:\CCC_ENGWAN\DMG\NOI DOC\07NOn07 NOI Te#.doc
<br />1026/06
<br />12
<br />
|