Laserfiche WebLink
<br />Netiee Requireaent; <br />Ne one lires xithin 1~2 vile <br />Exhibit A: <br />Enslseed vap <br />Exhibit H: <br />1) There is a let sf bushy pine trees on the site, not very tall, <br />ne Grans to speak of due to the thick layer of needles ox the ireund, <br />Also, there xas sove gavel taken out aa:~ years aCe~ I xould estivate <br />1,000 to 1,500 yards xere taken. The trees are ten to fifteen feet <br />high xhere this xas taken, I xeuld estivate 2_3 inches o! top soil <br />is on the site,. <br />2) The ont, etruetnre xould be the four wire barbed xire fence along <br />the read. <br />3) No xater resourses of any kind are near the site, <br />4) I ean~t think of any ivpaet en xildlife near the site, <br />Exhibit C: <br />1) I ha:e sustosrers xantinr rrarel nox, so I xould like to eemense <br />operation by Ju]a 10, 1991, and end in approxivate]a 25 years, depeniins <br />on hax etuoh I sell and how deep it is to bed rock. <br />2) I x111 sane a71 the top soil I can. ?he site is a ride that <br />xi1:L be fattened off, I plan t• stockpile the ;ravel iq~sels. ?his <br />way each eusto=er x111 net have a pile here and there. Also. I rill bare <br />beti:er osntrol of keeping the site xhere I want it. I will stockpile <br />the soil at the edge of the site; as soon as I have Wore than adequate <br />rooa for loading the gavel, I wi]1 beEin pushing top soil back over <br />the affected area. <br />3) ?here is no overburden of rock en the'site, The trees taken out <br />x117. be used for wood to help heat our house, <br />4) I hope to to 20 to 30 feet deep, er to bed rock. <br />5) The on7~ component would be the read to the site from Te]1er County <br />Road. $1, <br />6) The oxt1, disturbances xeul.d be top soil stock piles, nothin6 orer <br />ten feet high and 100 feet lonC. <br />7) Anew road ofY of Te71er County Road ,#1 to the site xould be <br />20_25 feet xide,, There are no existing roads at the site. <br />8) No rater Trill be used. <br />9) Ne water rill be encountered at the site. <br />10) No water rights will be interferred xith. <br />11) Only gavel rill be aired at the site. <br />12) Nsne <br />13) :Vo preeessin~ rill be done at the site, <br />(Mete) Net related <br />Exhibit D: <br />1) pverburden x111 be replaced as soon as I have yore than enouik roes <br />for :Loadinr. I estivate 3-4 inches of eaterial. <br />2) Afothin= steeper that 5 to 1 (probab]~ sore like 6 or 7 to 1) <br />~.. 2-3 inches <br />Es, At this altitude xe plant before Jwte 1 er after October 1, <br />I think disein~ would be adequate <br />C, S.C.S. x111 specify <br />D, I have a dri]1 to plant the seed, <br />