Laserfiche WebLink
SEDCAD 4 for Windows <br />rt~...,d,.~.~ ~ooa m..,a~ i c~e..,~~. <br /> <br />Structure #1 (Pond) <br />Pond Inputs: <br />Structure Detai/; <br />Initial Pool Elev; 6,555.00 <br />Initial Pool: 1.80 ac-ft <br />Emergency Soillway <br />Spillway Elev Crest Length Left Right Bottom <br />(ft) Sideslope Sideslape Width (ft) <br />6,555.00 80.00 1.50:1 1.50:1 40.00 <br />Pond Results: <br />Peak Elevation: 6,555.06 <br />Dewater Time: 0.14 days <br />Dewatering time is ca/cu/ated hom peak stege to lowest spil/way <br />• <br />• <br />Elevation-Capacity-Discharge Table <br /> <br />Elevation Area <br /> <br />(ac) Capacity <br /> <br />(ac-ft) Discharge <br /> <br />(~s) Dewater <br />Time <br />(hrs) <br />6,549.00 0.100 O.ODO 0.000 <br />6,549.50 0.126 0.056 0.000 <br />6,550.00 0.154 0.126 0.000 <br />6,550.50 0.186 0.211 0.000 <br />6,551.00 0.220 0.312 0.000 <br />6,551.50 0.250 0.930 0.000 <br />6,552.00 0.281 0.562 0.000 <br />6,552.50 0.315 0.711 0.000 <br />6,553.00 0.350 0.877 0.000 <br />6,553.50 0.402 1.065 0.000 <br />6,554.00 0.458 1.280 0.000 <br />6,554.50 0.517 1.523 0.000 <br />6,555.00 0.580 1.798 0.000 Spillway #1 <br />6,555.06 0.558 1.836 4.235 3.35 Peak Stage <br />6,555.50 0.590 2.090 32.646 <br />6,556.00 0.600 2.388 65.291 <br />Detailed Discharge Table <br />Filename: TaylorPump-SpillwayDesign.scA Printed OS-21-2002 <br />