Laserfiche WebLink
• , ~~~ ~~~~~~~~~~~~~~~~ EC~VED <br />~as~er (~or~orafcon ~ . <br />MAY 1 8 1917 u <br />~• ~• ~ J ~ S (~ RECLAMATION SECTION ~~A <br />00 S OnS, ~• Colo. Dept. of Natural Reso!uces <br />2T9C0 EFST FIFTH STgEET <br />P O 60% 3BT <br />SPN BE9NRq OIN O. C/.LIFO gNIF 92]03 <br />TELEPgONE TIC.BB <.9BI1 <br />TW% 910.332J2]I <br />State of Colorado <br />Department of Natural Resources <br />1313 Sherman St. <br />Denver, Colorado 80203 <br />GENERAL ENGINEERING CONTRACTORS <br />May 16, 1977 <br />Please Reply To: <br />P. 0. Box 1249 <br />Leadville, Colorado 80461 <br />Subject: Mt. Elbert Conduit <br />Spec. No. DC-7247 <br />Attention: Mr. James L. Schmieding <br />Reclamation Specialist <br />Mined Land Reclamation <br />Gentlemen: <br />This letter is to explain the need for haste in obtaining the mining <br />permit to obtain backfill mr the Mt. Elbert Conduit. <br />The working period on this project is controlled by the weather; <br />inasmuch as we cannot backfill the pipe when the temperature falls <br />below 32° Fahrenheit. The weather is-this area is very unpredictable; <br />fbrrefore we have no way of knowiag the exact working period. <br />We have made an asauptioa that we can 'work from May 15 to the first <br />of November, with undoubtedly some lost days in that period. It is <br />threfore imperative that we make use of every diy available. <br />Very truly yours <br />KASLER CORPORATION & L. H. WOODS & SONS, INC.(JV) <br />Carl W. Haney <br />Superintendent <br />CWH/he <br />