Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: Lorencito <br />NPDES ID. No.: Pond #7 <br />Inspection Period: 1st Quarter 2004 <br />Inspection Date: 3!27/04 <br />General Description or Reference to Site Plan: <br />This pond is located south of the area of mining scheduled for 2001-02. The pond <br />is partially incised into bedrock and the embankment keyed into bedrock. <br />Side slopes are less than 2H:1 V. The primary discharges south into Jeff Canyon <br />drainage, <br />EMBANKMENT <br />1). Adequacy of the vegetative cover: <br />2). Erosion forming Gullies: <br />3}. Is wave action causing erosion: <br />On the Upstream embankment? <br />At the principal spillway inlet? <br />Yes <br />Yes <br />4). Erosion of the downstream toe of the embankment? Yes <br />Cause of erosion can be attributed to: <br />Excellent Mode ar t~ Few Poor <br />Extensive Some l~~ None <br />Yes <br />5). Is seepage occurring through the dam? <br />Could this seepage cause potential instability? <br />PRINCIPAL SPILLWAY <br />1). Is the principal spillway system in working order? <br />2). Is the inlet free of debris and restrictive material? <br />3). Is the discharge outlet free of restrictive material? <br />4). Is erosion occurring at the discharge outlet? <br />Evaluate the severity: Extensive Moderate <br />Page 1 oft <br />No G~ <br />N o i/' <br />N o (r~ <br />No !~ <br />Yes ~ No <br />Yes y No <br />Yes~G No <br />Yes No (~ <br />Just starting None <br />