My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE67901
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE67901
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:13:34 PM
Creation date
11/20/2007 10:07:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000032
IBM Index Class Name
Permit File
Doc Date
6/22/2000
Doc Name
112 PERMIT REVISIONS FOR MONUMENT VIEW GRAVEL PIT PER STATE COMMENTS 6-16-2000
From
RG CONSULTING ENGINEERS INC
To
MESA COUNTY CLERK/RECORDER
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C~ <br />• Revision aI -Page 12 ol'7n <br />(4) The Soil Conservation Service was contacted and provided the original <br />recommended reseeding species. which was all Tall Wheac,rass. The seed mix has <br />been revised, at the request of the State Division of Minerals and Geology, to <br />include other species that will provide for a more diverse plant species. <br />(5) The [opsoil materials will be disked and mulched prior [o seeding, and will be drill <br />seeded, or broadcast and tilled into the soil- The [opsoil azea will also be fertilized in <br />accordance with the Soil Conservation Service's recommendations. <br />(6) The applicant understands that weed control will be necessary for the site. <br />(7) Fire lanes or access roads will not be required at the site. <br />(8) The property will not be used for refuse disposal purposes. <br />(9) Substitute planting will not be required for this project. <br />3.1.11. Building and Structures <br />The site contains no historic structures. <br />3.1.12 Signs and Markers <br />(1) A sign will be provided, visible from 23 Road, which mee[s the requirements of this <br />section. <br />(2) The boundary of the affected area will be clearly marked per the requirements of <br />this section by the fences provided around the permit area boundary. <br />Pan ?(d) <br />As discussed in this section, the top two to six inches of topsoil material will be stockpiled in the <br />buffer areas and preserved for site reclamation. Reclamation seeding information is discussed in <br />Part 2(a) of this section. <br />Pan 2(e) <br />See Part 2(a) of this section. <br />
The URL can be used to link to this page
Your browser does not support the video tag.