My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE67885
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE67885
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:13:34 PM
Creation date
11/20/2007 10:06:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200518906
IBM Index Class Name
Permit File
Doc Date
10/28/2005
Doc Name
Bond Estimate
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : X15 <br />Date : 10/282005 <br />User : JRS <br />Permit/job# : C-1981-010 <br />Abbreviation :none <br />Filename : C010-X15 <br />State :Colorado <br />County :Moffat <br />Site :Trapper Mine <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Notice of Intent X-2005-189-06 Amendment 1 <br />Task description :Replace TOpS01l flOIII StOCkp%/e f0 i <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Roads <br />Horsepower: 405 <br />Shift basis : 1 perday <br />Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $51.01 NA <br />Operating cosUhour : $93.55 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cost hour : $31.78 NA <br />Total unit cosUhour : $176.34 Total Fleet cosUhour : $178.34 <br /> <br />MATERIAL QUANTITIES ,.. „ <br />Initial Swell Loose <br />volume : 800 BCY factor : 1.250 volume : 1,000 LCY <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 150 feet <br />Unadjusted hourly production : 910.5 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient: 5.00 % Q <br />Average site altitude : 7,600 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Earth - Drv Hacked <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.503 /LCY <br />Operator skill : 0.75 (avg.) <br />Material consistency : 1.00 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efFciency : 0.83 (1 shif}/da} <br />Spoil pile : 0.80 (fnd-ri) <br />Push gradient : 0.90 (Cat HB) <br />Altitude : 0.95 (Cat Ht3) <br />Material weight : 0.90 (Cat HB) <br />Blade type : 1.00 (S/SUN) <br />Net correction : 0.39 <br />Adjusted unit production : 350.93 LCY/hr <br />Adjusted fleet production : 350.93 LCY/hr <br />Total job time : 2.85 Hours <br />Total job cost : $503 <br />
The URL can be used to link to this page
Your browser does not support the video tag.