Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : X13 <br />Date : 10/28/2005 <br />User : JRS <br />County : Mof/at <br />Site :Trapper Mine <br />Permivjob# : C-1981-010 <br />Abbreviation :none <br />Filename : CO10-X13 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Notice of Intent X-2005-189-06 Amendment 1 <br />Task description :Regrade Light-Use Roads <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $51.01 NA <br />Operating cosUhour : $93.55 100 <br />Ripper op.cosUhour : $0.00 0 <br />Operator cosUhour : $31.78 NA <br />Total unit cosUhour : $176.34 Total fleet cosUhour : $176.34 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,500 BCY factor : 1.250 volume : 1,875 LCY <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />> :: <br />HOURLY PRODUCTION <br />Job Condition Correction Factors ;; <br />Source <br />Average push distance : 150 feet <br />Unadjusted hourly production : 910.5 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 5.00 % (/ <br />Average site altitude : 7,600 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% EaRh <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />State :Colorado <br />Operator skill : 0.75 (av <br />Material consistency : 0.90 (Cat <br />Dozing method : 1.00 (ge <br />Visibility : 1.00 (av <br />Job efficiency : 0.83 (fshiti <br />Spoil pile : 0.80 (fnc <br />Push gradient : 0.90 (Cat <br />Altitude : 0.95 (Cat <br />Material weight : 0.87 (Cat <br />Blade type : 1.00 (SIS <br />Net correction : 0.33 <br />Adjusted unit production : 303.92 LCY/hr <br />Adjusted Fleet production : 303.92 LCY/hr <br />Total job time : 6.17 Hours <br />Unit cost : $0.580 /LCY Total job cost : $1,088 <br />