Laserfiche WebLink
This condition will be monitored on the same schedule as listed in no. 3 above, in <br />• addition to visual b <br />ti <br />n <br />d <br />t <br />d d <br />il <br />P <br />b <br />d ill <br />t <br />ll <br />th <br />lid <br /> o <br />serva <br />o <br />s con <br />uc <br />e <br />a <br />y. <br />ea <br />o <br />y w <br />no <br />a <br />ow <br />e s <br />e <br /> material to remain permanently in the spillway. Peabody will remove the material <br /> promptly under safe operating conditions to minimize dist urbance of the hydrologic <br /> balance. <br />5. The slide monitoring data and reports will be kept on file et the mine site and <br />Division office. The information will also be submitted fortnightly to the CDMG <br />until the slide is repaired. <br />b. A slide remediation plan will be submitted to DMBG within 60 days of approval of the <br />minor revision. <br />• <br />• <br />13-4A-2 Revised 05/04/93 <br />