Laserfiche WebLink
<br />COLONY <br />Partial Permit Reclar,ation Costs <br />Final grading & shaping <br />Ripping (12 - 24") <br />Topsoil removal stockpiling <br />and replacement ~12" over 3 <br />1 acre = 1613 yd x 2.5/yd ) <br />Seedbed preparation <br />Seed <br />Seedlings (.50 each, 450/acre) <br />Seeding <br />Drill <br />Broadcast <br />Mulching <br />Native hay ($75/ton at <br />1 ton/acre) <br />Hydromulch ($160/1000 lb <br />at 200 lb/acre) <br />Destruction of Road and D1ine <br />bench prior to final reve- <br />getation <br />removal of asphalt <br />scarcification of surfaces <br />removal of pipes <br />,diddle Fork drainage <br />preparation <br />MATERIAL AND <br />ACRES EQUIPMENT LABOR <br />83 41,500 33,200 <br />83 41,500 39,400 <br />TOTAL <br />60 241,950 136,850 <br />83 5,800 22,900 <br />83 6,200 -- <br />83 18,700 -- <br />60 4,500 7,100 <br />23 1,900 2,800 <br />73 5,500 17,300 <br />10 3,200 5,100 <br /> 370,750 264,550 635,941 <br />3,300,000 <br />Approximate Total 4,000,000 <br />